Skip to main content

Box 53

 Container

Contains 28 Results:

Summary of recent translations of Russian lunar data, December 27, 1966

 Item — Box: 53, Folder: 17
Identifier: MSA 5, Series 1, Sub-Series 5, Sub-Group 4, File 1, Item 20
Scope and Contents From the Sub-Group:

The Mission Planning files contain those materials essential to the planning and execution of the Apollo program mission, especially the Apollo 11 lunar landing mission. The bulk of the sub-group is retained in Armstrong's original order. However, a significant amount of mission planning material was found throughout the Armstrong papers.

Dates: December 27, 1966

Summary Timeline: Nominal Lunar Surface EVA, January 1969

 Item — Box: 53, Folder: 18
Identifier: MSA 5, Series 1, Sub-Series 5, Sub-Group 4, File 1, Item 21
Scope and Contents From the Sub-Group:

The Mission Planning files contain those materials essential to the planning and execution of the Apollo program mission, especially the Apollo 11 lunar landing mission. The bulk of the sub-group is retained in Armstrong's original order. However, a significant amount of mission planning material was found throughout the Armstrong papers.

Dates: January 1969

Task: Attempt to determine what might be done to shorten the time between wake up in lunar orbit and landing (by several hours) in order to permit EVA prior to sleeping on the lunar surface, undated

 Item — Box: 53, Folder: 19
Identifier: MSA 5, Series 1, Sub-Series 5, Sub-Group 4, File 1, Item 22
Scope and Contents From the Sub-Group:

The Mission Planning files contain those materials essential to the planning and execution of the Apollo program mission, especially the Apollo 11 lunar landing mission. The bulk of the sub-group is retained in Armstrong's original order. However, a significant amount of mission planning material was found throughout the Armstrong papers.

Dates: undated